search archive
browse collections Back to Previous Folder

Folder 11: Buildings and Grounds: Construction

Object Type: Folder
In Folder: Box 060


View Gallery

Title
Description
Date

Members of the art faculty with Provost Burgess at the Fine Arts building renovation. Art instructor, Kenneth G. Daley is seen third from right.

circa 1980-1989

Art instructor, Kenneth G. Daley looking at blueprints for the renovated Fine Arts building.

circa 1980-1989

A construction worker installs roof beams to the ODU Boat House.

1982-07-02

An unidentified contruction worker braces concrete for a campus building project.

circa 1980-1989

An unidentified man carries plants to the Mills Godwin, Jr. Life Sciences Building.

1981-01-23

A bulldozer operator breaks up and moves soil between Duckworth and Kaufman Halls. A glass connecting structure is being built between the two buildings in order to create one building for the College of Engineering.

circa 1980-1989

An unidentified construction worker satnds on the roof of a campus building.

circa 1980-1989

An unidentified construction worker stands in front of a pile of blocks at the Life Sciences Building.

circa 1980-1989

A construction worker cuts pipe rod for the Life Sciences Building.

1980

Empty boxes clutter the hallway during construction work at the Life Sciences Building.

1981-01-23

The Fine Arts Building gets a complete renovation.

circa 1980-1989

A group of workers fix a leaky roof on the Fine Arts Building.

circa 1980-1989

An unidentified construction worker installs flooring at the Physical Education Building.

circa 1980-1989

A construction worker installs new flooring at the Physical Education Building.

circa 1980-1989

A construction worker's hard hat rests a top of the Life Sciences Building.

1980

Two construction or maintenance workers haul a tree on a forklift truck.

circa 1980-1989

James Pethel, ODU Project Inspector, inspects the installation of new telephone lines.

1988

A construction worker installs pipe rods on the roof of the Life Sciences Building.

1980

Construction of Mid-Rise Residential Hall.

circa 1980-1989

Landscape construction work at the new Public Safety Building.

1984

A worker paints a wall in the gymnasium at the Physical Education Building.

circa 1980-1989

Construction workers from W.B. Meredith Inc. do a balancing act atop the beams of the new Fine Arts Center at 49th Street and Elkhorn Avenue. After a long delay, things are literally looking up at the center. The anticipated completion date for the facility is October 24, 1990.

1989-06-16

A construction worker welds a steel support to Kaufman Hall.

circa 1980-1989

Workers clean the windows at the Life Sciences Building.

1981-01-23

Powered by Preservica
© Copyright 2024, Old Dominion University Libraries. All rights reserved.