Object Type: Folder
In Folder: Box 060
Members of the art faculty with Provost Burgess at the Fine Arts building renovation. Art instructor, Kenneth G. Daley is seen third from right.
circa 1980-1989
Art instructor, Kenneth G. Daley looking at blueprints for the renovated Fine Arts building.
circa 1980-1989
An unidentified contruction worker braces concrete for a campus building project.
circa 1980-1989
An unidentified man carries plants to the Mills Godwin, Jr. Life Sciences Building.
1981-01-23
A bulldozer operator breaks up and moves soil between Duckworth and Kaufman Halls. A glass connecting structure is being built between the two buildings in order to create one building for the College of Engineering.
circa 1980-1989
An unidentified construction worker satnds on the roof of a campus building.
circa 1980-1989
An unidentified construction worker stands in front of a pile of blocks at the Life Sciences Building.
circa 1980-1989
Empty boxes clutter the hallway during construction work at the Life Sciences Building.
1981-01-23
An unidentified construction worker installs flooring at the Physical Education Building.
circa 1980-1989
A construction worker installs new flooring at the Physical Education Building.
circa 1980-1989
Two construction or maintenance workers haul a tree on a forklift truck.
circa 1980-1989
James Pethel, ODU Project Inspector, inspects the installation of new telephone lines.
1988
A construction worker installs pipe rods on the roof of the Life Sciences Building.
1980
A worker paints a wall in the gymnasium at the Physical Education Building.
circa 1980-1989
Construction workers from W.B. Meredith Inc. do a balancing act atop the beams of the new Fine Arts Center at 49th Street and Elkhorn Avenue. After a long delay, things are literally looking up at the center. The anticipated completion date for the facility is October 24, 1990.
1989-06-16