119 results after applying filter
In complete archive
Construction of Kaufman Hall (School of Engineering), January 1964.
circa 1960-1969
An unidentified contruction worker braces concrete for a campus building project.
circa 1980-1989
Construction workers from W.B. Meredith Inc. do a balancing act atop the beams of the new Fine Arts Center at 49th Street and Elkhorn Avenue. After a long delay, things are literally looking up at the center. The anticipated completion date for the facility is October 24, 1990.
1989-06-16
Construction material being used for the new additions and renovations to the ODU library.
circa 1990-1999
The four-story parking garage at the corner of 43rd street and Elkhorn Avenue will have 600 parking spaces, approximately 500 of which will be available for faculty, staff, and student with valid permits. The remaining spaces will have parking meters.
circa 1990-1999
A construction worker mixes cement a top the Diehn Performing Arts Center.
circa 1990-1999
Construction of the F. Ludwig Diehn Center for the Performing Arts.
circa 1990-1999
New science building under construction, 1953-54.
1954-04-14
House wreckers demolish the old houses on 48th Street to make way for the new library of the college of W&M in Norfolk during the summer of 1957.
1957
The site of the new library building to be constructed on 48th Street west of Hampton Boulevard, Fall 1957.
1957
Foundation being set for the Hughes Library, northside of 48th Street goes up, Spring 1958.
1958
Foundation being set for Hughes Library, located northside of 48th Street, Spring 1958.
1958
Solar wall going up around Hughes Library, undated.
circa 1950-1959
Kodacolor photo of the Hughes Library under construction, July 1959.
1959-07
The library building under constructiuon on the north side of 48th Street. Mr. William Pollard, Librarian at the College of Willam and Mary in Norfolk inspects the progress of the new building, Spring 1959.
1959
The front and east side of the new building with solar screen almost completed. The building will be ready for occupancy in September [1959].
1959
The solar screen goes up on the west side of the new library building. The solar screen will serve as a decorative screen to filter the sunlight and help cool the building in summer. It will also add serenity to the interior.
circa 1950-1959