Object Type: Folder
In Folder: Box 086
A hole is made in the upper floor wall of the Alfriend Chemistry Building, so equipment can be moved in.
circa 2000-2005
A hole is made in the upper floor wall of the Alfriend Chemistry Building, so equipment can be moved in. Maintenance crew wait for the equipment as it is delivered via crane.
circa 2000-2005