Ground is being cleared to make way for the foundation of Constant Convocation Center.
2001
Coach Blaine Taylor of the ODU Men's Basketball team talks to a university official at the Constant Convocation Center construction site.
circa 2000-2005
Coach Blaine Taylor of the ODU Men's Basketball team talks with Ron Tola, Assistant Vice President for Facilities Management and David Robichaud, Assistant Director for Design and Construction.
circa 2000-2005
A concept drawing of the Constant Convocation Center and University Village, along with the Maglev rail transport.
circa 2000-2005
Wooden molds for the concrete stairs at the Constant Convocation Center.
circa 2000-2005
The main seating area of the Constant Convocation Center is being built.
2001
The main seating area of the Constant Convocation Center is being built.
2001
Concrete columns of the Constant Convocation Center are being formed.
2001
A crane lifts materials onto the construction site of the Constant Convocation Center.
2001
Construction men go down the concrete stairs of the seating area.
2001
A close up of the construction crane working on the Constant Convocation Center.
2001
Electrical cables on the site of the Constant Convocation Center.
2001
Two construction men sit on beams while building materials are brought down.
2001
Construction men gather building materials at the Constant Convocation Center site.
2001
The freshly poured concrete floor of the Constant Convocation Center is being smoothed out by workers.
2001
The freshly poured concrete floor of the Constant Convocation Center is being smoothed out by workers.
2001
A close-up of the main seating area of the Constant Convocation Center is being built.
circa 2000-2005
A close-up of the main seating area of the Constant Convocation Center is being built.
circa 2000-2005
Surrounding areas near the future site of the Constant Convocation Center are being demolished and cleared to make way for construction. Photo was possibly taken from upper floors of Batten Arts and Letters. The neighborhood in the background was later demolished for the construction of the University Village.
2001
Surrounding areas near the future site of the Constant Convocation Center are being demolished and cleared to make way for construction. Photo was possibly taken from upper floors of Batten Arts and Letters. The neighborhood in the background was later demolished for the construction of the University Village.
2001
Construction of the Constant Convocation Center Parking Garage as seen from Hampton Boulevard.
circa 2000-2005
Construction in progress with the Constant Convocation Center Parking Garage.
circa 2000-2005
The sign announcing the "future site of the Ted Ted Constant Convocation Center" located off of 44th Street and Hampton Boulevard.