Folder 07: Buildings and Grounds: Convocation Center-Construction

Object Type: Folder
In Folder: Box 086

▲

View Gallery

Title ▲ ▼
Description
Date

Ground is being cleared to make way for the foundation of Constant Convocation Center.

2001

Coach Blaine Taylor of the ODU Men's Basketball team talks to a university official at the Constant Convocation Center construction site.

circa 2000-2005

Coach Blaine Taylor of the ODU Men's Basketball team talks with Ron Tola, Assistant Vice President for Facilities Management and David Robichaud, Assistant Director for Design and Construction.

circa 2000-2005

A concept drawing of the Constant Convocation Center and University Village, along with the Maglev rail transport.

circa 2000-2005

Wooden molds for the concrete stairs at the Constant Convocation Center.

circa 2000-2005

The main seating area of the Constant Convocation Center is being built.

2001

The main seating area of the Constant Convocation Center is being built.

2001

Concrete columns of the Constant Convocation Center are being formed.

2001

A crane lifts materials onto the construction site of the Constant Convocation Center.

2001

Construction men go down the concrete stairs of the seating area.

2001

A close up of the construction crane working on the Constant Convocation Center.

2001

Electrical cables on the site of the Constant Convocation Center.

2001

A lone steam beam waits for its connecting beam

2001

Two construction men sit on beams while building materials are brought down.

2001

Construction men gather building materials at the Constant Convocation Center site.

2001

The freshly poured concrete floor of the Constant Convocation Center is being smoothed out by workers.

2001

The freshly poured concrete floor of the Constant Convocation Center is being smoothed out by workers.

2001

A close-up of the main seating area of the Constant Convocation Center is being built.

circa 2000-2005

A close-up of the main seating area of the Constant Convocation Center is being built.

circa 2000-2005

Surrounding areas near the future site of the Constant Convocation Center are being demolished and cleared to make way for construction. Photo was possibly taken from upper floors of Batten Arts and Letters. The neighborhood in the background was later demolished for the construction of the University Village.

2001

Surrounding areas near the future site of the Constant Convocation Center are being demolished and cleared to make way for construction. Photo was possibly taken from upper floors of Batten Arts and Letters. The neighborhood in the background was later demolished for the construction of the University Village.

2001

Construction of the Constant Convocation Center Parking Garage as seen from Hampton Boulevard.

circa 2000-2005

Construction in progress with the Constant Convocation Center Parking Garage.

circa 2000-2005

The sign announcing the "future site of the Ted Ted Constant Convocation Center" located off of 44th Street and Hampton Boulevard.

circa 2000-2005

Powered by Preservica